New kitchen at Kitchener MB Church
- CA MAO XV-19.3-1992-14-3780
- Item
- 195-
Negative also. Infor. on back: "Modern kitchen just off the new auditorium-gymnasium."
Unknown
18 results with digital objects Show results with digital objects
New kitchen at Kitchener MB Church
Negative also. Infor. on back: "Modern kitchen just off the new auditorium-gymnasium."
Unknown
New education wing at Kitchener MB Church
Negative also. Entrance to new educ. wing. to the left of thechurch building
Unknown
Kitchener Mennonite Brethrem Church
Negative only. Used in CM 4-41-8. Front & side of church building with construction of the addition visible at the back of the church See 14.3767 f. for views of the church building & construction.
Unknown
Kitchener MB church with new addition at right
Negative also. Infor. on back: "Rear ofchurch, new addition at right."
Unknown
Kitchener MB Church Sunday School wing under construction
Negative also. Used in CM 4-24-9. SS wing being built in the early stages, beside thechurch building
Unknown
Kitchener MB Church Sunday School room
Negative also. Infor. on back: "Spacious, carpeted SS room in new addition." Two similar photos of same room.
Unknown
Kitchener MB Church pledge thermometer
Negative also. Thermometer put up in the church to show progress towards raising monies (pledges & loans) for the new addition. Caption on back of photograph: "Monies for new addition ($155,000) raised by pledges and loans entirely within membership. To cost $230,000 on contract, the church members did much of the work themselves from the architectural plans to painting and decorating - to save some $75,000."
Unknown
Negative also. Infor. on back: "Nursery, carpeted, movable partition, kitchenette & washroom, looking out onto as yet unfinished outdoor patio."
Unknown
Kitchener MB Church new education wing
Negative also. Close up view of rear ofchurch building with new educ. wing. Infor. on back: "Old at left, new at right."
Unknown
Kitchener MB Church infants' room
Negative also. Infor. on back: Infant's room in old church basement."
Unknown
Negative also. Front & side view ofchurch building in winter. New educ. wing at left. See CM 4-41-8 re. photo of church with frame of educ. wing visible behind thechurch building See 1992-3769f. for other outside views of buildings.
Unknown
Kitchener MB Church front entrance with new wing
Negative also. Front entrance ofchurch building and new education wing to left of the building
Unknown
Two copies of photo. Front & side view of church building with frame of education wing going up at the back. See 1992-14.3767, used in CM 4-24-9, re. construction of educ. wing.
Unknown
Part of Mennonite Archives of Ontario collection of photographs
The Jubilation Male Chorus, a choral group made up of members of Kitchener MB and others from the local community, in concert in 2010. The director is Jake Willms and the pianist is Norman Giesbrecht. Choir members are: Vern Allemang, Alan Baxter, Fred Beattie, John R. Black, Jack Boehmer, Mel Briant, Landis Brubacher, John Coghill, Bob Crofoot, George Driediger, Mel Eby, Nyle Eby, Peter Enns, Larry Erb, Gerry Fernandez, John Griffiths, Bob Harloc, Alvin Hershberger, Len Huebner, Ken Huehn, Gerry Jansen, Fritz Kesting, John Klassen, Grant Koch, Peter Kroh, David Lacey, Doug Lacey, Jim Lacey, Jake Loewen, Frank Luellau, Gerry Martin, Frank Morgan, Doug Musselman, Marv Musselman, Erwin Penner, Dale Quesnel, Ernie Riediger, Peter Schmidt, Al Schultz, Laverne Schwartzentruber, Burnell Shantz, Ralph Shantz, Vern Sherk, John Siekmans, Paul Snyder, Vern Starra, Harry Swartz, Chuck Thompson, John Wall, Elmer Warkentin, Ron Watson, Ralph Weber, Vern Widmeyer, Fred Witmer, Rainer Wohlgemut.
Unknown
Interior of Kitchener MB Church
Negatives also (4). Interior ofchurch building, taken from the balcony. View of pulpit in center & choir loft behind it. Three copies of photo, one shows more of the pews.
Unknown