Construction of the Greater Winnipeg Water District aqueduct. Photo shows the aqueduct with approx. 30 workers standing on it. There is also a large pipe laying/concrete finishing machine in the background. Description written on back of photo says, "Big mixer on A line"
Construction of the Greater Winnipeg Water District aqueduct. Workers pouring the concrete for a section of the aqueduct; large concrete pouring machine in the background.
Long incomplete section of the Greater Winnipeg Water District aqueduct with temporary railway tracks beside it as well as workers, a horse, and other temporary structures beside the line.
Construction of the Greater Winnipeg Water District aqueduct. Workers pouring the concrete for a section of the aqueduct; large concrete pouring machine in the background. Same photo as 720-27 from a slightly different angle.
Crew of 5 men working to repair dredge used in construction of the Greater Winnipeg Water District aqueduct. Photograph has the names Peter Unger and Al Reimer written on it.
Dredge used in the construction of the Greater Winnipeg Water District aqueduct. Two workers are standing on the dredge and one worker beside. The trench dug by the dredge is in the foreground.