- CA MHSBC 2-6-1-2018.076.002
- Item
- 1944-1948
Part of Bethel Mennonite Church fonds
Basement and balcony were added in 1944 and 1948.
Unknown
4 results directly related Exclude narrower terms
Part of Bethel Mennonite Church fonds
Basement and balcony were added in 1944 and 1948.
Unknown
New construction with contractor Walter Goertz
Part of Bethel Mennonite Church fonds
Scaffolding surrounding the exterior of the new church building.
Unknown
Old and new buildings of Bethel Mennonite Church
Part of Bethel Mennonite Church fonds
Old and new church buildings are standing side by side.
Walter Goertz beside the church.
Part of Bethel Mennonite Church fonds
Walter Goertz is holding the last spike of the church construction.
Warkentin, Agatha